Oracle Corporation
Cloud ProviderLegal name: Oracle Corporation · HQ: US · Public (ORCL) · Founded 1977
Cloud provider and lead infrastructure builder for the Stargate initiative. Delivered over 1.2 GW of new data center capacity to customers in FY2026 and has secured 10 GW of power for the coming three years. Environmental disclosure has not kept pace with the buildout; no fleet-wide PUE or absolute energy figures are published.
Disclosure Quality
Score
30/100
Transparency Grade
T-4
minimal disclosure
Grades run T-1 (most transparent) to T-5 (least transparent).
Red flags identified (2)
- RF-01 · Total energy consumption not disclosed
- RF-04 · AI-specific energy use not disclosed
See the disclosure audit below for details.
Fiscal year 2026. Score computed from OpenButterfly T1–T6 disclosure framework audit. Confidence tier: C (Estimated, Documented Method).
Environmental Metrics
Fiscal year 2026. Each metric is shown at its most recent available year; rows from a different year are marked.
Confidence tiers: A measured and verified · B company-reported · C documented estimate · D uncertain estimate · E modeled · ND not disclosed.
Total Energy Consumption
23.3 TWh
≈ the annual electricity use of 2.2 million US homes
method: known_capacity_model
Source: OpenButterfly pipeline
Scope 1 Emissions
128 kt CO₂e
≈ the annual emissions of 28,000 passenger cars
method: scope1_ratio_model
Source: OpenButterfly pipeline
Scope 2 Emissions (market-based)
3.41 Mt CO₂e
≈ the annual emissions of 741,000 passenger cars
method: grid_carbon_model
Source: OpenButterfly pipeline
Scope 3 Emissions
12.97 Mt CO₂e
≈ the annual emissions of 2.8 million passenger cars
method: scope3_ratio_model
Source: OpenButterfly pipeline
Water Withdrawal
27.9 GL
≈ 11,000 Olympic swimming pools of water
method: wue_model
Source: OpenButterfly pipeline
Property-Line Noise (estimated)
~56.2 dBA at property line
method: cooling_load_noise_model
Source: OpenButterfly pipeline
Disclosure Audit
Show 5 disclosure checks (T1–T6 framework)
Total electricity consumption disclosed
Renewable percentage reported; absolute MWh consumption not published despite the largest capacity buildout in company history.
RF-01 (Total energy consumption not disclosed)
AI-specific energy consumption disclosed
No AI or OCI workload energy attribution despite Stargate-scale AI infrastructure delivery.
RF-04 (AI-specific energy use not disclosed)
Scope 1 GHG emissions disclosed
Scope 1 reported in the annual Environmental and Social Impact datasheet.
Total water withdrawal disclosed
Limited water reporting; no facility-level or fleet-total withdrawal figures for the new AI buildout.
GHG accounting methodology documented
GHG Protocol referenced in impact reporting.
Sources
- Oracle FY2026 earnings and capex disclosures· sec filing · trust: high · accessed 2026-07-18
FY2026 revenue $67.4B, capex $55.7B.
- Oracle stood up 400MW in latest quarter, secured 10GW of power· journalism · trust: medium · accessed 2026-07-18
Capacity delivery and power pipeline figures.
- Oracle Environmental and Social Impact reporting· sustainability report · trust: high · accessed 2026-07-18
FY2025 impact datasheet; Scope 1/2 reporting.